John and Balmoral closed for road work
Sam Goldstein News construction, Thunder Bay
The intersection of John Street and Balmoral Street will be closed daily between 8 a.m. and 6 p.m. for approximately two days.
The work is focused on infrastructure repairs to prepare for the resurfacing of the intersection.
The southbound ramp from John Street will remain open during the construction.
Author
-
Sam Goldstein is a 2025 graduate of the Seneca Polytechnic journalism program. Sam’s great passions are for history, politics, and food. Born and raised in Toronto, he works as a multimedia journalist in Thunder Bay. You can reach him at goldsteins@radioabl.ca.